Marine Environment Protection

Reporting Ship Sourced Pollution

National Plan

Place of Refuge Guidelines

Educational resources and information

Major Oil Spills in Australia

Prevention of Pollution from Ships

National Maritime Emergency Response Arrangements

AMSAs Role in Maritime Environmental Issues

Register of Local Fuel Oil Suppliers

Torres Strait PSSA

Aerial Dispersant Spraying Capability

National Plan to Combat Pollution of the Sea by Oil and other Noxious and Hazardous Substances
Annual Report 1997/98

AMSA, as managers of Australia's National Plan, and the Australian Institute of Petroleum (AIP), through its Australian Marine Oil Spill Centre (AMOSC), have put in place a Fixed Wing Aerial Dispersant Capability (FWADC) for the spraying of oil spill dispersant. This capability has been achieved through a three year contract with Australian Maritime Resources (AMR) based in Adelaide.

As part of the FWADC Contract there is a formal requirement to review the contractual arrangements at the conclusion of the first twelve months of the Availability Period and upon each subsequent twelve months.

The NPAC FWADC Working Group at a meeting held in Adelaide on 4 February 1998 undertook the review. The Contractors representative, Mr Dennis Elliott, also attended the meeting

The objectives of the review included, but were not be limited to:

(a) determining whether contract arrangements best meet the needs of the National Plan;

(b) determining whether any amendments or variations should be made to the Contract to improve delivery of the services stipulated by the Contract;

(c) consider expanding the terms and conditions applicable to the 5% performance component of the Contract to cover all key performance aspects;

(d) determine performance parameters for next year of contract;

(e) review need to incorporate additional aircraft for expanded coverage or capability

(f) determining whether the contract should continue.

  The following documentation was examined as part of the review

The review included presentations and discussions in the following areas:

The review formally endorsed the continuation of the Contract in its current form with all stakeholders satisfied with the current level of performance and management of the contract.