Planned Maintenance – 15 January 2022 to 28 February 2022AMSA conducted a Planned Maintenance Focused Inspection Campaign (FIC) over the period 15 January 2022 to 28 February 2022.
Our organisation has observed that a number of Administrations are issuing dispensations to ships where a defect has occurred to a critical piece of equipment. There are differing circumstances where we will and will not accept the dispensation.
This safety lesson describes how experienced Queensland prawn trawl fisher, Tony Sterling, developed an inpull winch that pulls in both sides of the trawl gear at the same time. The winch has delivered major safety benefits because crew no longer need to go out onto the booms.
The 2017 National Plan exercise ‘Exercise Constant Bearing’ was held in Adelaide, South Australia, from 5 to 7 December. A full overview of the exercise including evaluation insights and recommendations, can be found in this report.
Residual current devices minimise the risk of a person receiving an electric shock or being electrocuted when using plug-in electrical equipment on board vessels.
Streamlined equipment lists for non-survey fishing vessels operating within 2 nautical miles of land in specified warm waters and in beach fisheries within 200 metres of land.