Survey vessels in these classes are required to carry a Scale G first aid kit on board: 1D (with unberthed passengers), 1E (with unberthed passengers), 2D, 2E, 3D and 3E.
A 2C rescue vessel was preparing to depart a river entrance bar with 11 people onboard. The observed sea state was a wave height (breaking) of 1.4 to 1.8 metres. The entrance bar had a moderate to high level of congestion of jet skis and surfboard riders positioned within the aids to navigation departure leads.
The vessel came within very close proximity to surfers on 3 occasions whilst negotiating the breaking sea conditions. The vessel then broached upon a wave resulting in the vessel heeling to port and becoming unable to be controlled due to the force of the wave.
This marine notice highlights shipowners, operators, masters and crews obligation to ensure safe working arrangements are in place for any work involving a ship’s elevator.
This advice is for ship owners and masters. We will undertake a focused inspection campaign (FIC) on livestock ships from 1 March to 31 August 2021. The campaign will target all livestock ships departing Australian ports.
In June 2018 our Response Division delivered a workshop in Melbourne which explored how Australia could deliver an effective response to a complex maritime emergency.